hello sir I was studying substation engineering design and digital components. I have some doubts about the project you assigned to me. I’d like to know whether I should simulate the project or write the question’s content. I having some trouble understanding the question. cloud you can give some hand for understanding the project’s question.
hello sir!I was studying substation engineering design and digital components. I have some doubts about the project that you assigned to me.
How to segregate feeders for clusters with both residential and industry
We need to voltage level classification PPT
Where to draw the SLD?
Task 1: Gated community W/sqft
What to do with common facility
Task 2: How to classify Aux loads based on continuous, intermittentWhat is the power factor to be considered to convert kW to kVA in order to calculate the maximum demand of each cluster
I was waiting for your reply. Thank you